Validation Lifecycle Management
Validation is not an event. It is a lifecycle — plan, validate, operate, monitor, retire — and each stage produces evidence a future inspector will read. Validation lifecycle management software (VLM) manages that lifecycle as one thing, in one system, from URS to system retirement.
Plan → Validate → Operate → Monitor → Retire. Each stage produces the artefacts the next stage depends on, without exports or re-entry.
Real-time analytics against your validated systems catch drift before the periodic review, not after.
Retirement produces a signed final evidence pack — inspection-portable long after the system is decommissioned.
A GxP computerized system spends most of its life in the operational phase — not in initial validation. VLM software has to manage every stage:
Most validation programs run on point tools: a document management system for the protocols, a ticketing tool for deviations, a spreadsheet for the traceability matrix, an ITSM tool for change control, an analytics tool for the periodic review. Each tool holds part of the lifecycle. None holds the whole thing.
The result is what most inspectors find: an audit-day scramble to reassemble the lifecycle for one system across five tools. The audit passes or fails on how well the team can do that reassembly under time pressure.
How cGen fits
cGen holds the whole lifecycle in one substrate. Every system in the GxP application inventory has a linked validation project, a linked change history, a linked periodic-review schedule, and a linked monitoring dashboard. Inspector Mode assembles the lifecycle view on demand — filtered to one system, one date range, one inspector — in seconds.
FAQ
We value your privacy
We use analytics cookies to understand how you use our site. No advertising or tracking cookies.